MoDOT Safe & Sound Bridge Improvement Project
Statewide, Missouri
Owner: Missouri Department of Transportation
Construction Costs: $487 Million (Est.)
Scope of Services:
- Program Management
- Final Bridge Plans
- Bridge Standard Development
- Final Roadway Construction Plans
- Preliminary Bridge Plans
- Hydraulic Analysis
Description:THE LPA GROUP INCORPORATED is the co-lead design firm for the KTU Constructors Design-Build team for this landmark project that includes replacement of 554 structurally deficient bridges across the state of Missouri. All 114 counties in the state have at least one bridge for a total of 2 million square feet of bridge deck. The bridges will be replaced using accelerated construction techniques with the majority of the structures consisting of standardized precast superstructures and substructure components. The average construction duration of each bridge is only 45 days. THE LPA GROUP is responsible for the roadway, hydraulic, and bridge design for 372 of the 554 bridges. Design will be completed in 18 months with the construction of all of the bridges completed within 42 months.
|