One of the projects performed by THE LPA GROUP INCORPORATED under its multi-year contra...
The base bid includes the construction of a new 110,000 square foot asphalt aircraft pa...
THE LPA GROUP INCORPORATED was given the primary task of rehabilitating the airport's p...
THE LPA GROUP INCORPORATED performed the design to reconstruct and overlay the Daytona ...
THE LPA GROUP INCORPORATED performed the design to rehabilitate and overlay 12,500 feet...
This project, performed by THE LPA GROUP of North Carolina, P.A., an affiliate of ...
THE LPA GROUP INCORPORATED was selected by DynCorp International to lead the design eff...
THE LPA GROUP INCORPORATED, along with our joint venture partners on the Aviation Consu...
This project consisted of the 4,600-foot extension of Runway 18R/36L and its parallel t...
The project included construction of additional general aviation parking apron by reloc...
The Team of THE LPA GROUP INCORPORATED and The Rogers Group was selected by the US Army...
A terminal area study was conducted to evaluate expansion of the existing terminal faci...
Due to physical constraints with the surrounding community, the existing airport that s...
The project consisted of construction of roadway improvements to enhance traffic flow i...
On November 3, 2003, the citizens of St. Petersburg approved keeping the property that ...
Taxiway "L" is a new taxiway parallel to, and between, Runway 9R/27L and 9L/2...
THE LPA GROUP of North Carolina, P.A., an affiliate of THE LPA GROUP INCORPORATED, a So...
The south metropolitan region of Greater Atlanta was identified in the recent State Sys...